Banner Installation
With 10+ years of outdoor banner installation expertise in Hong Kong, we excel in regulatory compliance and technical precision. As a trusted partner of government bodies, we streamline approvals and client-specific requirements.
Our skilled team handles diverse installations (e.g., façades, roadside railings) with strict safety protocols. Tailored solutions are backed by post-installation support for sustained performance.
Integrated printing and design services enable rapid deployment, delivering high-impact outdoor campaigns.
Multiple material options available
Exterior Wall Banner Installation
- Select equipment based on installation height.
- Confirm permit requirements for aluminium scaffolding.
- Choose materials accordingly (e.g., frontlit/backlit flex).
- Verify if additional insurance is required.
- Add V-cut vents for wind-prone locations.
- Use reinforcement ropes based on site conditions.
- Obtain permits for road occupation or crane usage.
- Engage professional design services for aesthetic coherence.
- Pre-coordinate for rooftop or complex installations.
- Inspect fixtures for retrofits with professionals.
- Assess structural feasibility beforehand.
- Evaluate environmental constraints (e.g., weather, timelines).
Fence Banner Installation
- Submit permits (e.g., Highways Department, LCSD).
- Reserve top-right space for permit number and validity.
- Maintain detailed installation logs.
- Clarify removal protocols for existing banners.
- Document obstructions and report promptly to avoid cost overruns.
5-14 days
# Submit photos and site details for new locations.
# Select durable materials based on environmental exposure.
# Construction must be authorised by the property owner.
Banner Installation

Why Choose Our Services?

Why Choose Us
We Are Your Most Reliable Choice

Why Choose Us
We Understand the Practical Needs of SME Clients

Why Choose Us
Comprehensive Service, Helping You Complete Orders from Start to Finish
- If acceptance and payment of the remaining balance cannot be arranged immediately after installation, our company will charge an additional administrative fee.
- All installation information shall be based on the contents of the “ Site Inspection Report ” , If the client does not require our company to provide the “ Site Inspection ” service, the client must provide a detailed and accurate “ Site Inspection Repor ” for submission. The engineering personnel can only arrange quotations and follow-ups after receiving the complete report
- All installation costs are quoted based on the information contained in the “ Site Inspection Report ” , If there are changes or discrepancies in the report that prevent the normal completion of the project, the client must bear the additional costs, and our company also reserves the right to charge extra installation fees.
- If it is found that goods require manual handling ( such as being unable to use a trolley and needing to be carried up stairs ) such as being unable to use a trolley and needing to be carried up stairs , our company will charge an additional delivery fee.
- If there are other reasons causing a delay in starting or leaving the site ( i.e., requiring waiting ) , our company reserves the right to charge additional waiting fees.(The first 15minutes of waiting are free; thereafter, the charge is $100 for every 15 minutes, with any time less than 15 minutes rounded up to 15 minutes, and fees collected immediately.
- If unforeseen safety factors or property loss occur at the construction site, preventing the work from proceeding as planned on the day of the quotation, our company will need to renegotiate the installation schedule or costs.
- If the client incurs losses due to the following circumstances, our company will not be responsible for additional costs:
* Client-provided information affecting the project includes : dimensions, locations, surface treatment of the locations, materials, installation time, and installation methods.
* Unforeseeable impacts include : typhoons, heavy rain warnings, thunderstorm warnings, and special rain conditions during outdoor installations.